临汾苫先货运代理有限公司

Hello, welcome to visit the official website of Liaoning Qianfeng Steel Plastic Pipe Manufacturing Co., Ltd.!

news

Product

contact us

Liaoning Qianfeng Steel Plastic Pipe Manufacturing Co., Ltd.

Address: Dawa Lingang Economic Zone, Panjin City

Website: m.qcti.cn


Sales of a company

General Manager: Zhao Lei 18241448558

Sales Minister: Liu Wenli 18841483313

Sales Second Company

General Manager: Zhao Shuxiu 13188225517

Sales Minister: Pei Xiaojun 13804148185

Sales three companies and foreign trade

General Manager: Dai Gang 13604976693

Sales Minister: Chen Liming 18524274505

Sales four companies

General Manager: Chen Tieyan 18341472200

Sales Director: Meng Lin 19904144892

How to prevent longitudinal expansion and contraction of pipes and fittings

Your current location: Home >> News >> Industry News

How to prevent longitudinal expansion and contraction of pipes and fittings

Date of release:2019-10-18 Author: Click:

The heat expansion and contraction phenomenon of pipe fittings during construction in winter or summer can easily damage PE pipe fittings. Therefore, it is necessary to prevent longitudinal expansion and contraction of PE pipe fittings. Large-caliber water supply pipe


The pipe fittings should be laid in a serpentine shape in the pipe trench, with a slight curved arc, leaving a margin for expansion, and when installing PE pipes, as far as possible, no expanders or double coil short pipes should be used to replace the expanders. When making PE pipe fittings buttresses and town piers, both sides should be simultaneously poured with concrete at one time. The bottom foundation of PE pipe fittings must be cushioned with fine sand and not less than 100 mm. After the PE pipe fittings are installed, the 500mm backfill work on both sides and the top of the pipe must be backfilled and compacted, and the backfill compaction coefficient is not less than 95%.

大口徑給水管材 

When pipe fittings are installed in hot weather, they should be constructed as far as possible from night to 8:00 in the morning. The atmospheric temperature is low, and the pipes are properly contracted and then backfilled and the final joints meet. They must be compacted in layers to prevent thermal expansion and contraction of the pipes. Large internal stress failure.


The address of this article:http://m.qcti.cn/en/news/388.html

Key word:大口徑給水管材,大口徑給水管材廠家,大口徑給水管材哪家好

Recently browse:

Please leave a message for us
Please input the message here, and we will contact you as soon as possible.
name
Contacts
Telephone
Telephone
mailbox
mailbox
address
address
连平县| 上林县| 常熟市| 巴彦淖尔市| 米林县| 固安县| 呼图壁县| 馆陶县| 奇台县| 察隅县| 六安市| 嘉荫县| 金溪县| 庆元县| 泸定县| 沂南县| 东丽区| 东至县| 忻城县| 贵定县| 永吉县| 长兴县| 普兰店市| 鸡西市| 蒙城县| 德兴市| 胶州市| 沭阳县| 茌平县| 淮滨县| 安阳市| 莒南县| 肃北| 哈巴河县| 三门峡市| 杭锦旗| 门源| 洛阳市| 津市市| 威宁| 岐山县|